Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
VOIVODSHIP DRIVER TRAINING CENTER
Comprehensive owner’s representative/supervision services for the electrical part of the entire VOIVODSHIP DRIVER TRAINING CENTER facility, including lighting of the maneuver yard, together with review and approval of the design documentation for connection to the operator’s grid together with the photovoltaic plant with a power output of up to 50 kW
CHOJNY WIND FARM (Olszówka & Grzegorzew) 12.8MW
Investor: QAIR – Construction of CHOJNY Wind Farm – construction of a HV/MV substation named GPO FW CHOJNY with two circuits Olszówka & Grzegorzew of MV lines constructed, for the needs of power output to the ENERGA operator’s grid from 6 wind turbines VESTAS 2.0-2.2MW with a total installed capacity of 12,8 MW were connected