POLECANE WPISY
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
Parzęczew & Września WIND FARMS 17.6MW
Investor: QAIR – Construction of Parzęczew & Września Wind Farms – construction of a MV SKP substation FW Parzęczew 1 and 2 with connection to PGE Dystrybucja Network and construction of a MV SKP substation FW Września 1 and 2 with connection to ENEA Operator Network. Supervising of electrical part in both projects with coordination of procedures grid connections all turbines VESTAS to the independent operator networks – 2x 8,8MW (total capacity 17,6MW)
PIOTRKÓW KUJAWSKI WIND FARM 24.5MW
Investor: ERG SpA – Construction of Piotrków Kujawski (Połajewo) Wind Farm – construction of a HV/MV substation named GPO FW POŁAJEWO and HV cable line 110 kV as connection to GPZ Piotrków Kujawski for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 3.5MW with a total installed capacity of 24,5 MW were connected
PRZYKONA WIND FARM 31.05MW
Investor: ENERGA Invest – Construction of two 30 / 30kV substations RSN ŻUKI and RSN PRZYKONA for connection to GPZ ŻUKI 110/30 / 15kV and construction of MV cable lines for connection of FW PRZYKONA with a total capacity of 31.05 MW from 9 VESTAS 3,45MW turbines installed – coordination and consulting in the field of electro-energy and wind farms.