Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
CHOJNY WIND FARM (Olszówka & Grzegorzew) 12.8MW
Investor: QAIR – Construction of CHOJNY Wind Farm – construction of a HV/MV substation named GPO FW CHOJNY with two circuits Olszówka & Grzegorzew of MV lines constructed, for the needs of power output to the ENERGA operator’s grid from 6 wind turbines VESTAS 2.0-2.2MW with a total installed capacity of 12,8 MW were connected
PRZYKONA WIND FARM 31.05MW
Investor: ENERGA Invest – Construction of two 30 / 30kV substations RSN ŻUKI and RSN PRZYKONA for connection to GPZ ŻUKI 110/30 / 15kV and construction of MV cable lines for connection of FW PRZYKONA with a total capacity of 31.05 MW from 9 VESTAS 3,45MW turbines installed – coordination and consulting in the field of electro-energy and wind farms.