POLECANE WPISY
GNIEW WIND FARM 22.0MW
Investor: AKUO Energy Poland – Construction of Wind Farm GNIEW (22 MW) – coordination of supervision and consultancy on the construction of GPO FW CIEPLE substation for the purpose of power evacuation to the network of ENERGA operator, along with coordination of the construction of a new two-track overhead line WN 110kV and crossing under the line 400kV (PSE) and modernization of adjacent stations
PIOTRKÓW KUJAWSKI WIND FARM 24.5MW
Investor: ERG SpA – Construction of Piotrków Kujawski (Połajewo) Wind Farm – construction of a HV/MV substation named GPO FW POŁAJEWO and HV cable line 110 kV as connection to GPZ Piotrków Kujawski for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 3.5MW with a total installed capacity of 24,5 MW were connected
OFFSHORE – PROJECTS UNDER PREPARATION
We will soon publish here information on Offshore projects which are currently under preparation. We are currently engaged in talks to cooperate with leading Offshore industry companies for the implementation of projects and ensuring supervision and quality control in the field of the electro-energy industry
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
Parzęczew & Września WIND FARMS 17.6MW
Investor: QAIR – Construction of Parzęczew & Września Wind Farms – construction of a MV SKP substation FW Parzęczew 1 and 2 with connection to PGE Dystrybucja Network and construction of a MV SKP substation FW Września 1 and 2 with connection to ENEA Operator Network. Supervising of electrical part in both projects with coordination of procedures grid connections all turbines VESTAS to the independent operator networks – 2x 8,8MW (total capacity 17,6MW)
CHOJNY WIND FARM (Olszówka & Grzegorzew) 12.8MW
Investor: QAIR – Construction of CHOJNY Wind Farm – construction of a HV/MV substation named GPO FW CHOJNY with two circuits Olszówka & Grzegorzew of MV lines constructed, for the needs of power output to the ENERGA operator’s grid from 6 wind turbines VESTAS 2.0-2.2MW with a total installed capacity of 12,8 MW were connected