POLECANE WPISY
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
Parzęczew & Września WIND FARMS 17.6MW
Investor: QAIR – Construction of Parzęczew & Września Wind Farms – construction of a MV SKP substation FW Parzęczew 1 and 2 with connection to PGE Dystrybucja Network and construction of a MV SKP substation FW Września 1 and 2 with connection to ENEA Operator Network. Supervising of electrical part in both projects with coordination of procedures grid connections all turbines VESTAS to the independent operator networks – 2x 8,8MW (total capacity 17,6MW)
ZIELONA-DĘBSK WIND FARM 121.0MW
Investor: POLENERGIA – Construction of ZIELONA-DĘBSK Wind Farm – construction of a substation named DĘBSK WF Main Delivery Point (GPO FW DĘBSK) for the needs of power output to the ENERGA operator’s grid, to which a total of eight circuits of MV lines constructed for the needs of energy takeoff from 55 wind turbines VESTAS 2.2MW with a total installed capacity of 121 MW were connected