POLECANE WPISY
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
Parzęczew & Września WIND FARMS 17.6MW
Investor: QAIR – Construction of Parzęczew & Września Wind Farms – construction of a MV SKP substation FW Parzęczew 1 and 2 with connection to PGE Dystrybucja Network and construction of a MV SKP substation FW Września 1 and 2 with connection to ENEA Operator Network. Supervising of electrical part in both projects with coordination of procedures grid connections all turbines VESTAS to the independent operator networks – 2x 8,8MW (total capacity 17,6MW)
CHOJNY WIND FARM (Olszówka & Grzegorzew) 12.8MW
Investor: QAIR – Construction of CHOJNY Wind Farm – construction of a HV/MV substation named GPO FW CHOJNY with two circuits Olszówka & Grzegorzew of MV lines constructed, for the needs of power output to the ENERGA operator’s grid from 6 wind turbines VESTAS 2.0-2.2MW with a total installed capacity of 12,8 MW were connected
POTEGOWO EAST WIND FARM 101.25MW
Investor: MASHAV Energia – Construction of the 110/30 kV HV/MV Bięcino Main Delivery Point and the 25 km long 110 kV HV cable line for the connection of the Potęgowo East (Potęgowo Wschód) WF (101.25 MW).
POTĘGOWO East (Potęgowo Wschód) Wind Farm – Supervision and Coordination Services of the electrical power part (Bięcino, Wrzeście-Kępno, Karzcino, Głuszynko-Grapice Wind Turbine Complex) – 38 wind turbines GE 2,5-2,75MW with a total installed capacity of 101.25 MW were connected