POLECANE WPISY
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
ZIELONA-DĘBSK WIND FARM 121.0MW
Investor: POLENERGIA – Construction of ZIELONA-DĘBSK Wind Farm – construction of a substation named DĘBSK WF Main Delivery Point (GPO FW DĘBSK) for the needs of power output to the ENERGA operator’s grid, to which a total of eight circuits of MV lines constructed for the needs of energy takeoff from 55 wind turbines VESTAS 2.2MW with a total installed capacity of 121 MW were connected
POTEGOWO EAST WIND FARM 101.25MW
Investor: MASHAV Energia – Construction of the 110/30 kV HV/MV Bięcino Main Delivery Point and the 25 km long 110 kV HV cable line for the connection of the Potęgowo East (Potęgowo Wschód) WF (101.25 MW).
POTĘGOWO East (Potęgowo Wschód) Wind Farm – Supervision and Coordination Services of the electrical power part (Bięcino, Wrzeście-Kępno, Karzcino, Głuszynko-Grapice Wind Turbine Complex) – 38 wind turbines GE 2,5-2,75MW with a total installed capacity of 101.25 MW were connected