GNIEW WIND FARM 22.0MW
Investor: AKUO Energy Poland – Construction of Wind Farm GNIEW (22 MW) – coordination of supervision and consultancy on the construction of GPO FW CIEPLE substation for the purpose of power evacuation to the network of ENERGA operator, along with coordination of the construction of a new two-track overhead line WN 110kV and crossing under the line 400kV (PSE) and modernization of adjacent stations
PIOTRKÓW KUJAWSKI WIND FARM 24.5MW
Investor: ERG SpA – Construction of Piotrków Kujawski (Połajewo) Wind Farm – construction of a HV/MV substation named GPO FW POŁAJEWO and HV cable line 110 kV as connection to GPZ Piotrków Kujawski for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 3.5MW with a total installed capacity of 24,5 MW were connected
OFFSHORE – PROJECTS UNDER PREPARATION
We will soon publish here information on Offshore projects which are currently under preparation. We are currently engaged in talks to cooperate with leading Offshore industry companies for the implementation of projects and ensuring supervision and quality control in the field of the electro-energy industry
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
ROZDRAZEW WIND FARM 16.8MW
Investor: RWE Renewables – Construction of ROZDRAZEW Wind Farm – construction of a HV/MV substation named GPO FW ROZDRAZEW and HV cable line 110 kV as connection to GPZ Kozmin Wlkp for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 2.4MW with a total installed capacity of 16,8 MW were connected
POTEGOWO EAST WIND FARM 101.25MW
Investor: MASHAV Energia – Construction of the 110/30 kV HV/MV Bięcino Main Delivery Point and the 25 km long 110 kV HV cable line for the connection of the Potęgowo East (Potęgowo Wschód) WF (101.25 MW).
POTĘGOWO East (Potęgowo Wschód) Wind Farm – Supervision and Coordination Services of the electrical power part (Bięcino, Wrzeście-Kępno, Karzcino, Głuszynko-Grapice Wind Turbine Complex) – 38 wind turbines GE 2,5-2,75MW with a total installed capacity of 101.25 MW were connected