POLECANE WPISY
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
PIOTRKÓW KUJAWSKI WIND FARM 24.5MW
Investor: ERG SpA – Construction of Piotrków Kujawski (Połajewo) Wind Farm – construction of a HV/MV substation named GPO FW POŁAJEWO and HV cable line 110 kV as connection to GPZ Piotrków Kujawski for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 3.5MW with a total installed capacity of 24,5 MW were connected
POTEGOWO EAST WIND FARM 101.25MW
Investor: MASHAV Energia – Construction of the 110/30 kV HV/MV Bięcino Main Delivery Point and the 25 km long 110 kV HV cable line for the connection of the Potęgowo East (Potęgowo Wschód) WF (101.25 MW).
POTĘGOWO East (Potęgowo Wschód) Wind Farm – Supervision and Coordination Services of the electrical power part (Bięcino, Wrzeście-Kępno, Karzcino, Głuszynko-Grapice Wind Turbine Complex) – 38 wind turbines GE 2,5-2,75MW with a total installed capacity of 101.25 MW were connected