GNIEW WIND FARM 22.0MW
Investor: AKUO Energy Poland – Construction of Wind Farm GNIEW (22 MW) – coordination of supervision and consultancy on the construction of GPO FW CIEPLE substation for the purpose of power evacuation to the network of ENERGA operator, along with coordination of the construction of a new two-track overhead line WN 110kV and crossing under the line 400kV (PSE) and modernization of adjacent stations
PIOTRKÓW KUJAWSKI WIND FARM 24.5MW
Investor: ERG SpA – Construction of Piotrków Kujawski (Połajewo) Wind Farm – construction of a HV/MV substation named GPO FW POŁAJEWO and HV cable line 110 kV as connection to GPZ Piotrków Kujawski for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 3.5MW with a total installed capacity of 24,5 MW were connected
OFFSHORE – PROJECTS UNDER PREPARATION
We will soon publish here information on Offshore projects which are currently under preparation. We are currently engaged in talks to cooperate with leading Offshore industry companies for the implementation of projects and ensuring supervision and quality control in the field of the electro-energy industry
APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
SULMIERZYCE WIND FARM 23.1MW
Investor: OX2 – Construction of the HV/MV GPO FW SULMIERZYCE 110/33kV station, the HV 110kV cable line and the MV cable lines for the connection of the SULMIERZYCE WF with a total capacity of 23,1MW from 7 VESTAS 3,3MW turbines installed – supervision and coordination in the field of electro-energy industry
ZIELONA-DĘBSK WIND FARM 121.0MW
Investor: POLENERGIA – Construction of ZIELONA-DĘBSK Wind Farm – construction of a substation named DĘBSK WF Main Delivery Point (GPO FW DĘBSK) for the needs of power output to the ENERGA operator’s grid, to which a total of eight circuits of MV lines constructed for the needs of energy takeoff from 55 wind turbines VESTAS 2.2MW with a total installed capacity of 121 MW were connected
ROZDRAZEW WIND FARM 16.8MW
Investor: RWE Renewables – Construction of ROZDRAZEW Wind Farm – construction of a HV/MV substation named GPO FW ROZDRAZEW and HV cable line 110 kV as connection to GPZ Kozmin Wlkp for the needs of power output to the ENERGA operator’s grid, to which a total 7 wind turbines NORDEX 2.4MW with a total installed capacity of 16,8 MW were connected