APARTHOTEL TERMY UNIEJOW
Investor’s representative/supervision services and comprehensive review of the documentation in the scope of the power and electrical part of the entire facility
CHOJNY WIND FARM (Olszówka & Grzegorzew) 12.8MW
Investor: QAIR – Construction of CHOJNY Wind Farm – construction of a HV/MV substation named GPO FW CHOJNY with two circuits Olszówka & Grzegorzew of MV lines constructed, for the needs of power output to the ENERGA operator’s grid from 6 wind turbines VESTAS 2.0-2.2MW with a total installed capacity of 12,8 MW were connected
ZIELONA-DĘBSK WIND FARM 121.0MW
Investor: POLENERGIA – Construction of ZIELONA-DĘBSK Wind Farm – construction of a substation named DĘBSK WF Main Delivery Point (GPO FW DĘBSK) for the needs of power output to the ENERGA operator’s grid, to which a total of eight circuits of MV lines constructed for the needs of energy takeoff from 55 wind turbines VESTAS 2.2MW with a total installed capacity of 121 MW were connected
SULMIERZYCE WIND FARM 23.1MW
Investor: OX2 – Construction of the HV/MV GPO FW SULMIERZYCE 110/33kV station, the HV 110kV cable line and the MV cable lines for the connection of the SULMIERZYCE WF with a total capacity of 23,1MW from 7 VESTAS 3,3MW turbines installed – supervision and coordination in the field of electro-energy industry